Lodestone Energy's second solar farm, Rangitaiki, came online in the Bay of Plenty and has been generating power ever since. Located a few kilometres from Edgecumbe, the site carries a name gifted by Ngāti Awa. Rangitaiki is closely tied to both the plains and the river, and holds deep meaning for many iwi across the rohe.
Construction began in March 2023 and brought together more than 130 workers, many of them from the local community. The farm produces over 50 GWh a year, which is sold to the market under contracts spanning many years, including supply to 25 North Island stores belonging to The Warehouse Group. Delivery was made possible by construction partners Infratec and New Energy, with operations and maintenance for Lodestone's five Phase 1 sites awarded to NewPower Energy, a WEL Networks subsidiary.
For Mansoor Shah and the MMDMM team, the most rewarding part of Rangitaiki was not the build itself, but what was learned along the way.


At Kaitaia, MMDMM connected to Top Energy's network. At Edgecumbe, the connection was to Horizon Energy's. On paper the two looked similar, yet the connection behaved quite differently, and it did not work the way it had in Kaitaia. Mansoor and the team had to rethink their approach and rework their information exchange protocol, refining it as they worked alongside Horizon's SCADA team. He found it fascinating to see how different parts of the industry tackle the same problem. Top Energy had its quirks and Horizon had its own, but together all parties arrived at the same conclusion on how to set up a system that worked.
Engaging with fellow market participants was the real highlight. Rangitaiki was the first site MMDMM connected via ICCP, and the process was a true collaboration with Horizon. The team learned how to link into Horizon's bespoke SCADA system and came to understand how they prefer to operate. Those lessons paid off immediately, allowing MMDMM to streamline commissioning and shorten the timeline as experience grew.


Control was another area where adaptation was needed. Each site was controlled differently, so Mansoor and the team had to relearn skills they thought were settled at Kaitaia. Adding Rangitaiki to the central SCADA system brought a fresh challenge too, as they learned that edits must be made in a structured, deliberate way. It was demanding, but Mansoor describes it as a great deal of fun.
With two farms complete and the third, Waiotahe, next in line, the experience gained at Rangitaiki shaped how MMDMM approached each project that followed. Every site taught something new, and the team carried those lessons forward, supporting solar generation in the regions it serves across both islands.